SUITABLE THICKNESS CHECK CORD: To discover a stability between weight and power. 3/8” is an acceptable thickness for lengthy coaching canine leash, it has each and every power and portability
NO TANGLE LONG ROPE LEASH: the spherical climbing rope and 360 diploma rotating clasp design lengthy coaching leash isn’t going to tangle whether or not it’s in use or whenever you roll it up, nice for mountaineering, tenting, coaching, searching, yard, seashore, recall coaching, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: comfortable and light-weight Non-absorbent materials will not get an increasing number of heavy within the water and received’t sink, it is going to drift when submerged and extremely seen in opposition to any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: verify wire has a snug woven double layer maintain, the joint of the rope is sewn by the machine and could also be very robust.
SIZE: 3/8″ (9.5 mm) in diam ,Measurement of this one is 15foot,shade Orange, by 10 foot 15 foot, 30 foot and 50 foot three size for more than a few coaching goal
Specification: lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
|
User Reviews
Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog”
You must be logged in to post a review.
$10.87
There are no reviews yet.